Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/corerepo/public_html/wp-includes/functions.php on line 6260
Kuje 132/33kV Substation Ready for Commissioning, Set to Add 144MW to National Grid - Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
Core Reporters
No Result
View All Result
Home Uncategorized

Kuje 132/33kV Substation Ready for Commissioning, Set to Add 144MW to National Grid

Core Reporters by Core Reporters
January 29, 2026
0
TCN, Partners Hold Community Outreach in Abia, Imo, Anambra Ahead of Transmission Line Upgrade
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Kuje 132/33kV Substation Ready for Commissioning, Set to Add 144MW to National Grid

 

The Kuje 132/33kV Transmission Substation is a 100 per cent completed facility. All equipment in both the control room and switchyard has been fully installed, while pre-commissioning tests have been successfully concluded. The substation is equipped with three (3) 60MVA power transformers, which will inject an additional 144 megawatts into the national grid upon commissioning.

RelatedPosts

تجنب الأخطاء: كيف يمكن المراهنة على 1xbet بذكاء؟

Spokojna Głowa: O chronieniu danych w Legalne Polskie Kasyno Online

Casino utan svensk licens: Finding the Right for You

The substation has nine (9) 33kV feeders that are ready to deliver bulk power to load centres within the Abuja Electricity Distribution Company (AEDC) network.

Upon commissioning, the Kuje Transmission Substation will significantly increase bulk power available to the DisCo for onward distribution to Kuje and Dafara communities. This development is expected to eliminate erratic power supply in the areas, stimulate local commerce, and improve the quality of life of residents.

The substation is supplied through two 132kV transmission lines—one from the Lugbe West Main Transmission Substation and the other

from the New Apo Transmission Substation. Its 132kV control room houses control panels for remote outdoor switching operations, as well as protection panels designed to safeguard the transformers, busbars, and other critical equipment.

In addition, the installed substation automation system enables remote control of all outdoor equipment and provides an interface for the National Control Centre (NCC) to monitor and operate the substation remotely.

 

 

 

Tags: 60MVA power transformersKuje 132/33kV Substation Ready for CommissioningSet to Add 144MW to National GridTCN
Previous Post

500 Lawyers Storm Finance Ministry Over Unpaid Debts To Contractors

Next Post

NISO Hails NNPC’s 350MW Abuja Power Plant Project, SCADA Rollout Progress

Core Reporters

Core Reporters

Related Posts

Uncategorized

تجنب الأخطاء: كيف يمكن المراهنة على 1xbet بذكاء؟

October 11, 2026
Uncategorized

Spokojna Głowa: O chronieniu danych w Legalne Polskie Kasyno Online

October 11, 2026
Uncategorized

Casino utan svensk licens: Finding the Right for You

October 11, 2026
Uncategorized

Стратегии выигрыша в приложении Пин Ап: онлайн игра на реальные деньги

October 10, 2026
Uncategorized

Udforskning af Kryptovalutaer i de Bedste Online Casinoer

October 10, 2026
Uncategorized

Die richtige Auswahl: Sportwetten ohne Oasis für Anfänger getroffen

October 10, 2026
Next Post
NISO Hails NNPC’s 350MW Abuja Power Plant Project, SCADA Rollout Progress

NISO Hails NNPC’s 350MW Abuja Power Plant Project, SCADA Rollout Progress

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • APC Leaders, Remi Tinubu Attend North Central Rally for Tinubu’s 2027 Re-election
  • World Mental Health Day: Police Medical Director AIG Nkechi Urges Officers to Prioritise Mental Health
  • Oyedele Reacts as Fitch Revises Nigeria’s Outlook to Positive as Oil Output Hits OPEC Target, Inflation Seen at 15.4%
  • Police Arrest 29-Year-Old Suspect Over Alleged Abduction of 11-Year-Old in Cross River
  • Nigerian Navy Uncovers 40,000 Litres of Suspected Crude Oil in Delta-Report Says

Recent Comments

  • bahamas luxury transportation on Nasarawa partners PAN, Keystone Bank, to revive own transport company
  • Austin Tyowua on Prof. Pam Bombshell: Blame Kwande, Fresh, others if Plateau United fails to emerge NPFL kings

Follow Us

Browse by Category

  • 20bet
  • best online casino
  • Business
  • casino
  • casino utan svensk licens
  • Entertainment
  • Feature
  • For The Record
  • Health
  • Investigation
  • News
  • Opinion
  • poli payment casino
  • Politics
  • Press Releases
  • review
  • Sports
  • Uncategorized
  • Сплиты

Recent News

APC Leaders, Remi Tinubu Attend North Central Rally for Tinubu’s 2027 Re-election

APC Leaders, Remi Tinubu Attend North Central Rally for Tinubu’s 2027 Re-election

October 11, 2026
World Mental Health Day: Police Medical Director AIG Nkechi Urges Officers to Prioritise Mental Health

World Mental Health Day: Police Medical Director AIG Nkechi Urges Officers to Prioritise Mental Health

October 10, 2026
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact

© 2024 Core Reporters

No Result
View All Result
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation