Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/corerepo/public_html/wp-includes/functions.php on line 6260
NISO Hails NNPC’s 350MW Abuja Power Plant Project, SCADA Rollout Progress - Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
Core Reporters
No Result
View All Result
Home News

NISO Hails NNPC’s 350MW Abuja Power Plant Project, SCADA Rollout Progress

Core Reporters by Core Reporters
January 29, 2026
0
NISO Hails NNPC’s 350MW Abuja Power Plant Project, SCADA Rollout Progress
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

NISO Hails NNPC’s 350MW Abuja Power Plant Project, SCADA Rollout Progress

The Nigerian Independent System Operator (NISO) has described the ongoing 350MW NNPC’s Abuja Gas Independent Power Project (IPP) as a vital step toward achieving the national target of 8,500MW grid generation capacity by the end of 2026.

RelatedPosts

a16z generative ai

a16z generative ai

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

Engr. Abdu Mohammed Bello, FNSE, Managing Director/Chief Executive Officer of NISO, made the commendation yesterday January 28,2026 during an on-site assessment visit to the project location.

Leading a high-level management delegation, he evaluated the current stage of construction and identified key areas for enhanced collaboration to accelerate project completion and timely commissioning.

The visit also included an inspection of the Supervisory Control and Data Acquisition (SCADA) implementation site at the Gwagwalada transmission substation.

Core Reporters report that the team expressed confidence that, before the end of 2026, the full electricity value chain, from generation through transmission to distribution will be integrated into a unified SCADA platform, enabling real-time visibility, improved grid monitoring, and enhanced system reliability and stability.

 

Tags: Engr. Abdul Mohammed BelloFNSENISO Hails NNPC’s 350MW Abuja Power Plant ProjectSCADA Rollout Progress
Previous Post

Kuje 132/33kV Substation Ready for Commissioning, Set to Add 144MW to National Grid

Next Post

Cross River Delegation Didn’t stage walk out, insists RMAFC report presentation to continue- Rt Hon Lebo

Core Reporters

Core Reporters

Related Posts

News

a16z generative ai

October 30, 2026
News

a16z generative ai

October 30, 2026
Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation
News

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

October 24, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

Senator Effiong Bob, Wife Celebrate Comfort FM Staff Over South-South’s Best Radio Station Award

October 23, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section

October 23, 2026
FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor
News

FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor

October 23, 2026
Next Post
Cross River Delegation Didn’t stage walk out, insists RMAFC report presentation to continue- Rt Hon Lebo

Cross River Delegation Didn't stage walk out, insists RMAFC report presentation to continue- Rt Hon Lebo

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • test
  • Melbet APK : télécharger gratuitement sur Android & iOS 2026
  • service_publish_probe_7550cb00c3a419a8
  • Live Dealer Casinos Explained: How to Play & Top Games 2026
  • How to Maximize Your Success with Bizbet Giriş in Online Betting

Recent Comments

  • bahamas luxury transportation on Nasarawa partners PAN, Keystone Bank, to revive own transport company
  • Austin Tyowua on Prof. Pam Bombshell: Blame Kwande, Fresh, others if Plateau United fails to emerge NPFL kings

Follow Us

Browse by Category

  • 1
  • 2
  • 20bet
  • 6
  • 9
  • amunra
  • best online casino
  • Business
  • casino
  • casino utan svensk licens
  • chat
  • Entertainment
  • Feature
  • For The Record
  • Game
  • Games
  • Health
  • house of jack
  • Investigation
  • legiano
  • magius
  • Michael Sturm
  • mostbet
  • News
  • nine casino
  • Opinion
  • pistolo
  • poli payment casino
  • Politics
  • Post
  • Press Releases
  • public
  • review
  • robocat
  • rocketpot
  • spinanga
  • Sports
  • Uncategorized
  • wazamba
  • Сплиты

Recent News

test

October 31, 2026

Melbet APK : télécharger gratuitement sur Android & iOS 2026

October 31, 2026
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact

© 2024 Core Reporters