Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/corerepo/public_html/wp-includes/functions.php on line 6260
TCN Upgrading Agbara 132/33kV Transmission Substation to Meet Up Demand - Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
Core Reporters
No Result
View All Result
Home News

TCN Upgrading Agbara 132/33kV Transmission Substation to Meet Up Demand

TCN is replacing one 45MVA power transformer with a 100MVA transformer, with the second one still in the circuit to ensure minimal load shedding during the upgrade. This is to minimize disruption. Once completed and energized, the second 45MVA transformer will then be upgraded to 100MVA, increasing the substation's total capacity from 150MVA to 260MVA

Core Reporters by Core Reporters
March 19, 2025
0
TCN Upgrading Agbara 132/33kV Transmission Substation to Meet Up Demand
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

TCN Upgrading Agbara 132/33kV Transmission Substation to Meet Up Demand

 

RelatedPosts

a16z generative ai

a16z generative ai

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

 

Abuja (Core Reporters) The Transmission Company of Nigeria (TCN) has announced the upgrading of its 2x45MVA to 2x100MVA Power Transformers at its Agbara 132/33kV Transmission Substation in Ogun State, under the Lagos region, aimed at increasing the substation’s capacity to meet the growing electricity demand in Agbara and its environs.

TCN is replacing one 45MVA power transformer with a 100MVA transformer, with the second one still in the circuit to ensure minimal load shedding during the upgrade. This is to minimize disruption. Once completed and energized, the second 45MVA transformer will then be upgraded to 100MVA, increasing the substation’s total capacity from 150MVA to 260MVA

A statement by the TCN General Manager Public Affairs, Ndidi Mbah said, “The Transmission Company of Nigeria (TCN) hereby notifies the public that it is undertaking an upgrade of its 2x45MVA to 2x100MVA Power Transformers at its Agbara 132/33kV Transmission Substation in Ogun State, under the Lagos Region.

“We appeal to electricity consumers taking supply from Agbara 132/33kV Transmission Substation to bear with us during the upgrade period, as there may be temporary load shedding. We assure you that normal electricity supply will be restored as soon as the upgrade is completed,” The statement said.

 

 

 

 

 

 

 

Tags: 2x45MVA to 2x100MVA Power TransformersAgbara 132/33kV Transmission SubstationNdidi MbahTCN
Previous Post

Senate Sets Up Ad-Hoc Committee to Probe Cameron Annexation of Nigerian Territories

Next Post

Emergency Rule: How so called leaders led Fubara into a bottomless pit

Core Reporters

Core Reporters

Related Posts

News

a16z generative ai

October 30, 2026
News

a16z generative ai

October 30, 2026
Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation
News

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

October 24, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

Senator Effiong Bob, Wife Celebrate Comfort FM Staff Over South-South’s Best Radio Station Award

October 23, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section

October 23, 2026
FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor
News

FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor

October 23, 2026
Next Post
We Are Not Surprised Of Your Lamentation-Group Tells Fubara 

Emergency Rule: How so called leaders led Fubara into a bottomless pit

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • test
  • Melbet APK : télécharger gratuitement sur Android & iOS 2026
  • service_publish_probe_7550cb00c3a419a8
  • Live Dealer Casinos Explained: How to Play & Top Games 2026
  • How to Maximize Your Success with Bizbet Giriş in Online Betting

Recent Comments

  • bahamas luxury transportation on Nasarawa partners PAN, Keystone Bank, to revive own transport company
  • Austin Tyowua on Prof. Pam Bombshell: Blame Kwande, Fresh, others if Plateau United fails to emerge NPFL kings

Follow Us

Browse by Category

  • 1
  • 2
  • 20bet
  • 6
  • 9
  • amunra
  • best online casino
  • Business
  • casino
  • casino utan svensk licens
  • chat
  • Entertainment
  • Feature
  • For The Record
  • Game
  • Games
  • Health
  • house of jack
  • Investigation
  • legiano
  • magius
  • Michael Sturm
  • mostbet
  • News
  • nine casino
  • Opinion
  • pistolo
  • poli payment casino
  • Politics
  • Post
  • Press Releases
  • public
  • review
  • robocat
  • rocketpot
  • spinanga
  • Sports
  • Uncategorized
  • wazamba
  • Сплиты

Recent News

test

October 31, 2026

Melbet APK : télécharger gratuitement sur Android & iOS 2026

October 31, 2026
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact

© 2024 Core Reporters