Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/corerepo/public_html/wp-includes/functions.php on line 6260
TCN Announces Temporary Power Outage in Benin–Ajaokuta 330kV Transmission Line - Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
Core Reporters
No Result
View All Result
Home News

TCN Announces Temporary Power Outage in Benin–Ajaokuta 330kV Transmission Line

Core Reporters by Core Reporters
March 1, 2026
0
TCN Announces Temporary Power Outage in Benin–Ajaokuta 330kV Transmission Line
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

TCN Announces Temporary Power Outage in Benin–Ajaokuta 330kV Transmission Line

The Transmission Company of Nigeria (TCN), Benin Region, has announced a temporary power outage on Benin–Ajaokuta 330kV Transmission Line to facilitate ongoing restringing works at the Ihovbor Power Plant Turn-In/Turn-Out Transmission Substation.

According to the TCN general manager public affairs, Mrs Ndidi Mbah on Saturday, the restringing project commenced on Friday, February 27, 2026, and would run through Tuesday, March 31, 2026, from 8:00am to 6:00pm daily.

RelatedPosts

a16z generative ai

a16z generative ai

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

According to Mbah, the exercise is necessary to enable TCN’s contractor to continue the restringing works on the 330kV transmission line connected to the Ihovbor Power Plant. Additionally, the project requires temporary power interruptions because the transmission line crosses major highways along the Benin–Ajaokuta axis. Road safety agencies have been duly notified and will be on standby to ensure public safety throughout the construction period.

Benin Electricity Distribution Company (BEDC) will be unable to supply electricity to its customers in UNIBEN, Oluku, Egba, and Ihovbor environs for up to 10 hours each day during the construction period.

Please note that restringing activities will be suspended daily at 6:00pm, after which the affected feeders will be restored. This means that BEDC will be able to off-take electricity to the above-mentioned areas from 6:00pm until 8:00am the following day.

TCN apologises for any inconvenience this may cause and assures all affected customers that full bulk power supply will be restored to the DisCo upon completion of the project.

 

 

Tags: Benin Electricity Distribution CompanyBenin–Ajaokuta 330kV Transmission LineNdidi MbahTCN GM public Affairs
Previous Post

Nigeria Calls for Restraint as Gulf Crisis Deepens

Next Post

Coordinated Strikes: Iran Reports Supreme Leader’s Death 

Core Reporters

Core Reporters

Related Posts

News

a16z generative ai

October 30, 2026
News

a16z generative ai

October 30, 2026
Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation
News

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

October 24, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

Senator Effiong Bob, Wife Celebrate Comfort FM Staff Over South-South’s Best Radio Station Award

October 23, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section

October 23, 2026
FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor
News

FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor

October 23, 2026
Next Post
Coordinated Strikes: Iran Reports Supreme Leader’s Death 

Coordinated Strikes: Iran Reports Supreme Leader’s Death 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • test
  • Melbet APK : télécharger gratuitement sur Android & iOS 2026
  • service_publish_probe_7550cb00c3a419a8
  • Live Dealer Casinos Explained: How to Play & Top Games 2026
  • How to Maximize Your Success with Bizbet Giriş in Online Betting

Recent Comments

  • bahamas luxury transportation on Nasarawa partners PAN, Keystone Bank, to revive own transport company
  • Austin Tyowua on Prof. Pam Bombshell: Blame Kwande, Fresh, others if Plateau United fails to emerge NPFL kings

Follow Us

Browse by Category

  • 1
  • 2
  • 20bet
  • 6
  • 9
  • amunra
  • best online casino
  • Business
  • casino
  • casino utan svensk licens
  • chat
  • Entertainment
  • Feature
  • For The Record
  • Game
  • Games
  • Health
  • house of jack
  • Investigation
  • legiano
  • magius
  • Michael Sturm
  • mostbet
  • News
  • nine casino
  • Opinion
  • pistolo
  • poli payment casino
  • Politics
  • Post
  • Press Releases
  • public
  • review
  • robocat
  • rocketpot
  • spinanga
  • Sports
  • Uncategorized
  • wazamba
  • Сплиты

Recent News

test

October 31, 2026

Melbet APK : télécharger gratuitement sur Android & iOS 2026

October 31, 2026
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact

© 2024 Core Reporters