Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/corerepo/public_html/wp-includes/functions.php on line 6260
Gov. Sule laments slow pace of work on 25km Mararaba-Udege road project - Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
Core Reporters
No Result
View All Result
Home News

Gov. Sule laments slow pace of work on 25km Mararaba-Udege road project

Core Reporters by Core Reporters
December 1, 2021
0
Gov. Sule laments slow pace of work on 25km Mararaba-Udege road project
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Nasarawa State governor, Engineer Abdullahi Sule, has lamented the slow pace of work on the ongoing 25km Mararaba-Udege road project.

RelatedPosts

a16z generative ai

a16z generative ai

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

Engineer Sule made his feelings known while inspecting the project site in Udege-Mbeki, on Tuesday.

The governor informed the officials of the Tongyi Group, the contractor handling the project, to expedite action in order to complete the project.

He particularly emphasized the need to complete the bridge leading into Udege-Mbeki, to which the contractor assured of its completion this month.

Engineer Sule tasked the Tongyi Group to deliver quality work first before seeking additional jobs, even as he assured the contractor of payment of 50 percent of the contract sum.

The governor, while commissioning a 10-bed ward built by a Chinese mining company in Udege-Mbeki, assured the commitment of his administration to complete the road project, including township roads.

He pointed out that when completed, the Mararaba-Udege road will enhance security and facilitate the movement of people in the area.

An official of the Tongyi Group, who conducted the governor round the site, assured that the project will be completed by this month.

Earlier, while en-route to Udege-Mbeki, the governor inspected the Model Government Girls Science Secondary School (GGSSS) Eyenu, where he interacted with the management of the school, as well as critical stakeholders from the area, with a view to further enhance academic activities in the school.

Along the way, Engineer Sule demonstrated his abiding love for children when he stopped intermittently to interact with school children that lined up the road to welcome him.

It will be recalled that the governor flagged off the N3.6billion Mararaba-Udege road  project while marking his second anniversary in office, with the project expected to be completed within a period of one year.

Tags: Gov. abdullahi suleNasarawa state
Previous Post

Kwese basketball sponsorship deal, alleged embezzlement story fake-Group insist

Next Post

Gov. Sule commissions 10-bed ward built by Chinese mining company in Udege-Mbeki

Core Reporters

Core Reporters

Related Posts

News

a16z generative ai

October 30, 2026
News

a16z generative ai

October 30, 2026
Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation
News

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

October 24, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

Senator Effiong Bob, Wife Celebrate Comfort FM Staff Over South-South’s Best Radio Station Award

October 23, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section

October 23, 2026
FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor
News

FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor

October 23, 2026
Next Post
Gov. Sule commissions 10-bed ward built by Chinese mining company in Udege-Mbeki

Gov. Sule commissions 10-bed ward built by Chinese mining company in Udege-Mbeki

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • test
  • service_publish_probe_7550cb00c3a419a8
  • Live Dealer Casinos Explained: How to Play & Top Games 2026
  • How to Maximize Your Success with Bizbet Giriş in Online Betting
  • Blackjack en ligne au Canada 2026 +500 jeux de casino

Recent Comments

  • bahamas luxury transportation on Nasarawa partners PAN, Keystone Bank, to revive own transport company
  • Austin Tyowua on Prof. Pam Bombshell: Blame Kwande, Fresh, others if Plateau United fails to emerge NPFL kings

Follow Us

Browse by Category

  • 1
  • 2
  • 20bet
  • 6
  • 9
  • amunra
  • best online casino
  • Business
  • casino
  • casino utan svensk licens
  • chat
  • Entertainment
  • Feature
  • For The Record
  • Game
  • Games
  • Health
  • house of jack
  • Investigation
  • legiano
  • magius
  • Michael Sturm
  • mostbet
  • News
  • nine casino
  • Opinion
  • pistolo
  • poli payment casino
  • Politics
  • Post
  • Press Releases
  • public
  • review
  • robocat
  • rocketpot
  • spinanga
  • Sports
  • Uncategorized
  • wazamba
  • Сплиты

Recent News

test

October 31, 2026

service_publish_probe_7550cb00c3a419a8

October 30, 2026
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact

© 2024 Core Reporters