Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/corerepo/public_html/wp-includes/functions.php on line 6260
Edo State Government Convenes Stakeholders’ Meeting to Address Erratic Power Supply - Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
Core Reporters
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record
  • Health
  • Opinion
  • Contact
No Result
View All Result
Core Reporters
No Result
View All Result
Home News

Edo State Government Convenes Stakeholders’ Meeting to Address Erratic Power Supply

Core Reporters by Core Reporters
May 6, 2026
0
Edo State Government Convenes Stakeholders’ Meeting to Address Erratic Power Supply
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Edo State Government Convenes Stakeholders’ Meeting to Address Erratic Power Supply

By Core Reporters

The Transmission Company of Nigeria (TCN), Benin Region, participated in a stakeholders’ engagement convened by the Edo State Ministry of Power to address persistent electricity supply challenges in the state. The meeting was held at the Conference Hall of the Office of the Secretary to the State Government (SSG), Government House, Benin City, on Thursday, 30th April 2026.

RelatedPosts

a16z generative ai

a16z generative ai

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

Speaking at the event, the General Manager, Benin Region, Engr. Charles C. Iwuamadi, stated that TCN remains the critical link in the power sector value chain, responsible for transmitting bulk electricity from generation companies (GenCos) to distribution companies (DisCos) load centres nationwide. He observed that while power sector challenges have persisted for over two decades with national generation hovering between 4,500MW and 5,000MW, transmission capacity in Edo State and the nation at large is adequate and has continued to grow.

He highlighted ongoing efforts to further strengthen bulk power transmission in Benin axis, citing the newly commissioned Ihovbor-Ajaokuta Transmission Line 1, which evacuates power from Benin to Ajaokuta and onward to Abuja, as well as the turn-in-turn-out project at the Irrua Transmission Substation, which is expected to further enhance bulk power transmission upon completion.

Engr. Iwuamadi explained that TCN lines within the region operate on an N-1 contingency arrangement, which ensures continuity of bulk power supply by providing an alternative line in the event of a fault, adding that the Benin axis has the capacity to restore bulk power supply relatively quickly due to its proximity to generation sources such as the Azura Power Plant.

He however pointed out that TCN’s capacity expansion efforts are being undermined by the activities of vandals and called for stronger support from the state government and host communities in protecting transmission infrastructure.

The General Manager also urged the government to assist TCN in removing encroachments on the right-of-way of transmission lines and corridors, noting that compensation was paid prior to the installation of the transmission towers and lines. He expressed concern over recurring damage to critical assets, which often results in significant losses and sometimes requires weeks to repair.

Some miscreants, he said have been arrested by security agencies, including the DSS and NSCDC, but stated that more needs to be done.

In other efforts to boost operational efficiency, the General Manager explained that TCN maintains a strict preventive maintenance programme, which is essential for the optimal performance of its equipment. He urged distribution companies to adopt similar maintenance practices to help strengthen their distribution networks.

The Assistant General Manager (System Operations), Benin Region, Engr. Patrick Amos, clarified that while TCN evacuates all generated power and delivers it to the load centres of distribution companies, the management of supply to end users falls outside their mandate.

Participants at the meeting included representatives of the Benin Electricity Distribution Company (BEDC), Niger Delta Power Holding Company (NDPHC), Azura Power, GTL Power Ltd, the Nigerian Independent System Operator (NISO), Meter Asset Providers (MAPs),, civil society and community groups.

 

Tags: Benin RegionEdo State Government Convenes Stakeholders’ Meeting to Address Erratic Power SupplyEngr. Charles C. IwuamadiEngr. Patrick AmosGeneral ManagerTCN
Previous Post

Breaking: Ojukwu Reaffirms NHRC’s Commitment to Protection of Workers’ Rights

Next Post

TCN Counters AEDC Over Lokoja Transmission Fault Claim

Core Reporters

Core Reporters

Related Posts

News

a16z generative ai

October 30, 2026
News

a16z generative ai

October 30, 2026
Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation
News

Tegbe Commissions 120MVA Transformer Upgrade in Katsina, Breaks Ground for New Mashi Substation

October 24, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

Senator Effiong Bob, Wife Celebrate Comfort FM Staff Over South-South’s Best Radio Station Award

October 23, 2026
FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section
News

FG Commissions 30.58km Abuja–Kaduna–Kano Expressway Section

October 23, 2026
FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor
News

FG to Address Zaria Railway Compensation Disputes, Consider Naming Extension After Emir’s Ancestor

October 23, 2026
Next Post
TCN, Partners Hold Community Outreach in Abia, Imo, Anambra Ahead of Transmission Line Upgrade

TCN Counters AEDC Over Lokoja Transmission Fault Claim

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result

Recent Posts

  • test
  • Melbet APK : télécharger gratuitement sur Android & iOS 2026
  • service_publish_probe_7550cb00c3a419a8
  • Live Dealer Casinos Explained: How to Play & Top Games 2026
  • How to Maximize Your Success with Bizbet Giriş in Online Betting

Recent Comments

  • bahamas luxury transportation on Nasarawa partners PAN, Keystone Bank, to revive own transport company
  • Austin Tyowua on Prof. Pam Bombshell: Blame Kwande, Fresh, others if Plateau United fails to emerge NPFL kings

Follow Us

Browse by Category

  • 1
  • 2
  • 20bet
  • 6
  • 9
  • amunra
  • best online casino
  • Business
  • casino
  • casino utan svensk licens
  • chat
  • Entertainment
  • Feature
  • For The Record
  • Game
  • Games
  • Health
  • house of jack
  • Investigation
  • legiano
  • magius
  • Michael Sturm
  • mostbet
  • News
  • nine casino
  • Opinion
  • pistolo
  • poli payment casino
  • Politics
  • Post
  • Press Releases
  • public
  • review
  • robocat
  • rocketpot
  • spinanga
  • Sports
  • Uncategorized
  • wazamba
  • Сплиты

Recent News

test

October 31, 2026

Melbet APK : télécharger gratuitement sur Android & iOS 2026

October 31, 2026
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Investigation
  • Feature
  • For The Record<